Bangkadi Industrial Park 1 & 2 CCCP Project

Location: Pathumthani, Thailand
Customer: IHI Corporation
End User: Amata B.Grimm Power
Year: 2013

Gas Turbine

Supplier: GE
Type: LM6000PD
Main Fuel: Natural Gas

HRSG

No. of Units: 4
Cycle Description: 2x2X1
Design: Single Wide V-One
Pressure Levels: 2 (HP, LP)

Auxiliary Components Provided by Vogt Power

External Deaerator and External Heat Exchanger
Attemperators:
» Interstage with 453°C Set Points
Economizer Bypass System
Stack Damper and Stack Silencer

UnfiredImperialMetric
HP Steam Flow49.4 tons/hr44.8 mtons/hr
HP Steam Pressure638.2 psi44.0 bara
HP Steam Temperature797°F425°C
LP Steam Flow16.9 tons/hr15.3 mtons/hr
LP Steam Pressure62.4 psi4.3 bara
LP Steam Temperature354.2°F179°C